Wednesday, April 23, 2008

Fisheries

In answering an interview question for the Hip Fish, I was reminded of the details of a Board action from 2006 that exemplifies what the county can do to promote economic development that builds upon local fishing traditions and diversifies the county’s economic base.

The Clatsop Fisheries Program is an economic development program that secures and administers grant funding for salmon research and production. The program runs three net-pen sites and one hatchery facility to benefit the region’s sport and commercial fisheries. The program has a long record of cooperation with the states of Oregon and Washington in the Select Area Fisheries Enhancement (SAFE) project funded by Bonneville Power Administration (BPA) since 1993, with Oregon Department of Fish and Wildlife since 1975, and with Oregon’s Fish Restoration and Enhancement program since 1988.

Some in the community felt the program could be better operated as a non-profit rather than run by the county. The Board gathered a committee of local fisheries experts to study and review the effectiveness and efficiency of the county run program and to recommend if a non-profit would be a better choice to run the program. The results of the study strongly recommended continuing the program under the county’s management.

The study concluded the program generated an annual gross revenue, region wide, through purchases of everything from fishing bait, fuel, eating out and to motel stays of over $ 3 million and was the source for over 400 jobs. The fact there was no recognition or credit for the success of the program illustrates how important periodic reviews by out side groups of county programs is. In response to the study, the Board established a stabilization fund for the program to ensure its continuation and its continuing contribution to our local economy.

Monday, March 24, 2008

The LNG Review Process

Here is an overview of the process used for reviewing the Bradwood Landing application for developing an import LNG terminal, pipeline and related facilities. Several issues are discussed in greater detail, but not all issues are covered. Remember, this is a 330 page document and written is legalize.

What has the Board of County Commissioners approved?

On March 20, 2008 the Board of County Commissioners discussed final revisions and voted to approve Bradwood Landing, LLC application for permits and development of an LNG Marine terminal, pipeline and related facilities. The document contains the conditions and required approvals necessary before a building permit will be issued, and the conditions required during the construction, operation and eventual decommissioning of the proposed development

This 330 page document covers every issue raised by the county during the approval process. Testimony from the public hearings is also addressed through these written findings. The Board, assisted by our planning consultant, planning staff and our land use attorney, as well as the Planning Commission deliberations and decisions, established conditions the applicant must meet to achieve compliance. The Planning staff had recommended denial of several issues until the applicant provided compliance. The Board took the approach of granting approval contingent upon the applicant meeting all approval criteria. The standards remain the same and end result is the same.

Review process to date:

The application process submittal to Clatsop County began December 12, 2006.

This initial application was found by the Clatsop County Planning Department to be incomplete. It took until February 14, 2007 for the application to be deemed complete. The Department then reviewed the application for compliance with the County’s Comprehensive Plan, Water Development and Use Ordinance (LWDUO) and Standards, and statewide planning goals. Next, the Planning Commission held public hearings on July 10 and 17, 2007 to hear testimony about the proposed development. The record was held open until July 31, 2007. Rebuttal was extended until August 17, 2007. The Planning Commission deliberated on August 28,2007 and on September 29, 2007 adopted their written findings recommending approval with conditions.

Next the Board of County Commissioners held public hearings on the application on November 19 and 26, 2007. The record was left open for additional comments and rebuttal until December 3, 2007. On December 13, 2007 the Board of County Commissioners deliberated and voted to give tentative approval to the application contingent upon preparation of suitable findings and approval by the Board. At the March 20, 2008 meeting revised findings were approved by the Board. County approval is not the final step in Bradwood’s permitting process. Before an LNG terminal may be built, Bradwood Landing LLC must also obtain permits from several state agencies and get authorization from the Federal Energy Regulatory Commission (FERC), Review by those state and federal agencies are now under way.

Industrial nature of the site.

Industrial use of Bradwood began in 1843 with the establishment of a sawmill at the base of Hunt Creek Falls. The railroad came in 1893. By 1930 an entire community had been built to serve those working in the mill. In 1983 the county zoned the mill site, Marine Industrial in recognition of the sites as “irrevocably committed” to water dependant industrial use. In 1990 the county reaffirmed this designation and established a 200 foot wide Aquatic Development Zone for a channel between the existing dock and the main Columbia River navigation channel. Waterway next to the existing dock area was also zoned Aquatic development at this time.

Two examples of required conditions for approval, both zone changes. At the time of the application the 40 acre terminal site was already zoned MI (Marine Industrial). Since an LNG terminal is considered an outright use in a MI Zone, why are any zone changes needed?

About five acres of wetlands, along the southern edge of the MI site is being rezoned to accommodate fill so the existing railroad can be re-aligned. Why is this allowable? The fill is necessary to accommodate the proposed development of the remainder of the site, and the loss of wetlands will be compensated by the creation of high quality estuary wetlands elsewhere.

Another zone change is required in the estuary, to accommodate a turning basin for LNG tankers. This change requires over 40 acres of Aquatic Conservation zoned water way be rezoned Aquatic Development so the necessary dredging can take place to deepen the area to accommodate the LNG ships. Some of the reasons given address the necessity of the dredging for the development of the upland use, that it is the minimum necessary for that development to occur, and that effort will be made to keep the negative impacts to a minimum.

The reasons given by the applicant for these zone changes must withstand the potential legal challenges of a Land Use Board of Appeals (LUBA) and the review of both state and federal agencies.

In addition to these rezone issues, a Mitigation Plan is another condition of approval., The Mitigation plan must demonstrate compliance with state and federal standards for the impact upon fish, fish habitat, aquatic organisms, tidal wetlands, non-tidal wetlands, riparian habitat, designated critical habitat and wildlife habitat. The applicant is in the process of compiling with these state and federal requirements.

The Bradwood sub-area plan called for any development to be small to medium in scale. How can this development be considered small?

There are two facts that indicate that this project can be identified as small to medium. First, the state of Oregon in an attempt to encourage development of former mill sires, around 1990, ruled that all former mill sites were exempt from any building size. ( other industrial site are limited to a 30,000 square foot square t building size for industrial development.) In fact Bradwood, a former mill site, is specifically named in Clatsop County documents as exempt from a limitation on building size. Second, the only other indicator of size in the planning documents state the relative number of acres of an industrial site. Large is defined as 100 acres or more. Bradwood, at 40 acres thus is on the lesser side of medium, or 50 acres. There is no height limit on industrial sites in Clatsop County.

Further, the Board stipulated that the small to medium size limited the site to a maximum of two LNG tanks. The applicant had request three tanks. The applicant had also requested all language limiting the site to the small to medium size development be removed from the approval criteria. Their request was denied. Further the application is limited to the 36 mile pipeline included in the approval document. No other pipeline is included in this approval.

Wednesday, February 20, 2008

A Little More Background

My profile on this site list my education and professional associations, however there are more that I would like to list here:

I am currently the Chairperson of the Clatsop County Board of Commissions and am serving my fourth year in office. In August, 2004 I was appointed to fill the remaining term of retiring Commissioner Bob Green after winning the May primary election. I was elected to a four-year term in November, 2004, which began in January of 2005.

I am self employed and have been the sole owner of an architectural design business in Gearhart since June 1991.

I was born and grew up in Portland, Oregon and spent many summers at the coast. I purchased my home in Gearhart in 1976 and moved here full-time in 1991. I have two grown children; a son who lives in Portland and a daughter who lives in New York. I am blessed with two grand sons and a grand daughter.

Other than the organizations listed in my profile that I am presently working with, I have in the past worked with:

American Institute of Architects as an associate member of both National and Portland chapters, with an interest in historic resources.

Clatsop County Historical Society Board of Directors and Officer.

Chair of the Gearhart Landmarks Commission.

Member of the National Trust Historic Preservation, Seaside Museum and Historical Society, the Lower Columbia Preservation Society and the Gearhart Heritage Committee.

My occupational background:

Patricia Roberts Residential Design: sole owner

Various Portland Architectural firms

Volunteer Coordinator for Friends of Pioneer Courthouse Square

A teacher in Portland Public Schools

My Government Experience:

Clatsop County Commissioner, District 2; appointed

Clatsop County Commissioner, District 2; elected

Gearhart Landmarks Commission; appointed

Gearhart Budget Committee; appointed

Precinct Committee Person; elected

Tuesday, February 19, 2008

Please Stand By

Please stand by while I develop this space as a communication tool not only for my up-coming campaign, but as yet another way to give and receive vital information on County Government.

I encourage comments, but please allow time for your comments and my replies to be published here. I am usually busy with my elected duties and am often called out of town, but I promise to address the issues as quickly as I possibly can.